In addition to providing background information on JDH&A, we also want this site to serve as a source of information related to the design of HDD crossings. In this regard, we have posted technical papers that have been authored by members of our firm, or by other professional engineers with whom we have worked closely over the years. If you use any of the posted material in another work, please respect the author’s and publisher’s copyright and cite it appropriately. You should also be aware that HDD design methods and techniques are constantly evolving and some of the information presented in these papers has become, or eventually will become, obsolete.
Papers
Puckett, J.S. (2011, May). Guidelines for Preventing Underground Utility Damage as a Result of Horizontal Directional Drilling. Presented at the 18th Biennial Joint Technical Meeting on Pipeline Research in San Francisco, CA, May 16-19, 2011.
Hair, J.D. (2011, February). Considerations in the Application of Horizontal Directional Drilling to Pipeline Construction in the Arctic. Presented at the Arctic Technology Conference in Houston, TX, February 7-9, 2011.
Hair, J.D. (2008, July). Pre-Construction Drillability Assessment for Horizontal Directional Drilling in Rock. Presented at an American Society of Civil Engineers Specialty Conference (Pipelines 2008) in Atlanta, GA, July 22-27, 2008.
Puckett, J.S. (2003, July). Analysis of Theoretical Versus Actual HDD Pulling Loads. Presented at an American Society of Civil Engineers Specialty Conference (Pipelines 2003) in Baltimore, MD, July 13-16, 2003.
Hair, J.D. (2002, August). Coating Requirements for Pipelines Installed by Horizontal Directional Drilling. Presented at an American Society of Civil Engineers Specialty Conference ( Pipelines 2002) in Cleveland, Ohio, August 4-7, 2002.
Hair, C.W., III (1996, June). To Know or Not To Know: The Site Characterization Process and its Role in Horizontal Directionally Drilled Pipeline River Crossings. Presented at an American Society of Civil Engineers Specialty Conference in Burlington, VT, June 16-19, 1996.
Huey, D.P., Hair, J.D., & McLeod, K.B. (1996, March). Installation Loading and Stress Analysis Involved with Pipelines Installed by Horizontal Directional Drilling. Presented at the International Society for Trenchless Technology International NO-DIG ’96 Conference in New Orleans, LA, March 31-April 3, 1996.
Hair, J.D. (1995, February). Design and Project Management Considerations Involved with Horizontal Directional Drilling. Presented at The International Workshop on Damage to Underwater Pipelines, New Orleans, LA, February 23, 1995.
Hair, C.W., III (1994, December). Site Investigation Requirements for Large Diameter HDD Projects. Presented at a Missouri Western State College Advanced Technical Seminar in St. Joseph, MO, February 5-8, 1995.
Hair, C.W., III (1993, April). Site Characterization for Horizontal Directional Drilling. Presented at the Directional Crossing Contractors Association Second Annual Spring Symposium, Brownsville, TX, April 15-17, 1993.
Hair, J.D. (1992, November). Design and Project Management Considerations Involved with Directionally Controlled Horizontal Drilling. Presented at a Louisiana Tech University Trenchless Technology Center Advanced Technical Seminar in Vicksburg, MS, January 26-30, 1993.
Hair, J.D. (1991, March). Analysis of Subsurface Pressures Involved with Directionally Controlled Horizontal Drilling. Presented at an American Society of Civil Engineers Specialty Conference in Denver, CO, March 25-27, 1991.
Hair, J.D., & Hair, C.W., III (1988, June). Considerations in the Design and Installation of Horizontally Drilled Pipeline River Crossings. Presented at an American Society of Civil Engineers Specialty Conference in Boston, MA, June, 1988.
Hair, J.D. (1985, March). Pipeline Landfall Construction by Horizontal Drilling. Presented at an American Society of Civil Engineers Specialty Conference (Arctic 85) in San Francisco, CA, March 25-27, 1985.
Magazine Articles
Puckett, J.S. (2020, August). Challenges In HDD Design. Trenchless Technology Horizontal Directional Drilling Guide 2020, 58-59.
Patonai, D.M. (2017, July). HDD Used To Cross Lake Sakakawea In North Dakota. Trenchless Technology, 80-81.
Rush, J.W. (2004, October). Duke Energy Hubline Project. Trenchless Technology, 23-24.
Hair, J.D. (1996, August). New Software Helps Estimate Trenchless Job Costs – Part 2. Pipe Line & Gas Industry, 41-44.
Hair, J.D. (1996, July). Planners Need Good Grasp of Trenchless Construction – Part 1. Pipe Line & Gas Industry, 21-23.
Hair, J.D. (1995, Winter). Drilling Fluid Criteria for Pipeline Installation by Horizontal Directional Drilling, Part II. NO-DIG Engineering, 2(4), 22-24.
Hair, J.D. (1995, Fall). Drilling Fluid Criteria for Pipeline Installation by Horizontal Directional Drilling, Part I. NO-DIG Engineering, 2(3), 22-24.
Hair, J.D. (1995, August). Directional Drilling Demands Practical Fluids Knowledge. Pipe Line & Gas Industry, 37-43.
Hair, J.D. & Hair, C.W. (1988, September). River-Activity History Evaluation Critical in Horizontally Drilled Crossing Design. Oil and Gas Journal, 65-68.
Hair, J.D. & Hair, C.W. (1988, September). Subsurface Soils Affect Horizontally Drilled River-Crossing Design. Oil and Gas Journal, 96-100.
Newspaper Articles
McPherson, D. (1995, July). Tunnel Under Canal Completed. Cape Cod Times, pp. A-1, A-12.